Subpart II - Equation II-1 & II-2

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 4.0

Please see Reporting Form Instructions instructions on downloading the blank reporting form and uploading the completed reporting form.
You may also refer to Optional Calculation Spreadsheet Instructions to download the Subpart II calculation spreadsheet.

1.) Fill out the anaerobic treatment process information table

  • Complete the table for each anaerobic reactor, deep lagoon, and shallow lagoon identified on tab 1. Introduction. Do not include any anaerobic sludge digesters identified on tab 1. Each unique identifier and anaerobic treatment process from tab 1 will automatically populate in this tab.
  • Confirm the calculated result (populated from tab 2) of annual mass of CH4 generated from the anaerobic wastewater treatment process.
  • Use the drop-down menu (displayed in the column to the left of this question) to indicate whether you would like to report the calculated result or an alternate result (displayed in the column to the right of this question). Calculated values are selected for reporting by default.
  • If you would like to override the calculated result and report and alternative value, select "Enter my own result (value will be rounded)" in column F and enter your override value in column G.
  • Ensure that column H reflects the value you wish to be included in your report.

This web site is maintained by a contractor to the U.S. Environmental Protection Agency (RY2023.R.01)