- Q16. Did EPA engage stakeholders in the development of the rule?
- Q62. Where can I find more detailed information on the rule?
- Q278. My facility has completed its use of best available monitoring methods (BAMM) and is now fully following the methods in the final rule. Do I need to notify EPA of this change?
- Q351. Have any of the equations been revised, or have any new equations been added since Subpart HH was finalized in 2009?
- Q454. If I use BAMM, do I still need to have a completed monitoring plan?
- Q645. Does equipment that has been sent out for reconditioning (not on-site) count toward the subpart DD threshold?
- Q763. Should the beginning of year nameplate capacity in the current reporting year equal the prior year's calculated end of year nameplate capacity?
- Q780. Different daily cover materials can be used throughout the year on the working face of a landfill. The surface area can change as additional lifts of waste are added. At what point in the year should the surface area measurements be taken?
- Q789. How do I get back to the "Add/Edit an Anaerobic Process" screen in the webform?
- Q790. I can't submit my report, how do I determine what errors are preventing my submission?
- Q801. Which facilities are located on tribal land?
- Q807. My facility is not required to report for RY 2014. Am I still required to report inputs to emissions equations that were deferred from reporting until 2015 for previous reporting years?
- Q818. How did reporting of emissions for Fluorinated Gas Producers change in 2015?
- Q821. How did EPA determine a facility's emissions by fuel type?