Destruction or Offsite Weekly
Please see Reporting Form Instructions on downloading the blank reporting form and uploading the completed reporting form.
Table 9 Instructions: Fill out the following table for ventilation and degasification system destruction devices or points of offsite transport on a weekly basis. Complete the table from top to bottom without skipping rows. All ventilation or degasification systems reported on Tab 7 should be included in the table below. The pick list in the first column of each table below links to a previous sheet, to restrict entry to previously entered destruction devices and points of offsite transport. The user will fill out four rows (quarters) for each device or point, and multiple weeks for each quarter (e.g., 14 weeks per quarter may include partial weeks at the start or end of the quarter). The table below includes space for 600 rows. If more are needed, please submit a request to the e-GGRT Help Desk at GHGReporting@epa.gov.
- Ventilation and degasification system destruction device or point of offsite transport Unit ID or Name Selecct from the pick list
- Quarter during which destruction or offsite transport took place Selecct from the pick list
- Week during which destruction or offsite transport took place Selecct from the pick list
- Weekly volumetric flow rate used to calculate CH4 destruction
- Specify units for weekly volumetric flow rate Select from the pick list
- Length of time that substitute data are used for the weekly volumetric flow rate used to calculate CH4 destruction
- Weekly CH4 concentration used to calculate CH4 flow
- Length of time that substitute data are used for the weekly CH4 concentration used to calculate CH4 flow