Subpart FF - Degas Weekly

Degas Weekly

Please see Reporting Form Instructions on downloading the blank reporting form and uploading the completed reporting form.

Table 6 Instructions: Fill out the following table for Degasification Gas Collection System Monitoring Points on a weekly basis. Complete the table from top to bottom and left to right without skipping rows.

The pick list in the first column links to a previous sheet, to restrict entry to previously centralized monitoring points and wells.

Information is reported on a weekly basis. The user will fill out four rows (quarters) for each monitoring point and multiple weeks for each quarter (e.g., 14 weeks per quarter may include partial weeks at the start or end of the quarter). Table 6 includes space for 2080 rows. If more are needed, please submit a request to the e-GGRT Help Desk at GHGReporting@epa.gov.

  • Degasification Gas Collection System Monitoring Point - Corresponds to centralized monitoring point or individual well from previous tab
  • Quarter in which the monitoring occurred
  • Week in which the monitoring occurred
  • Method used for flow rate and to calculate CH4 liberated from degasification systems used in Eq. FF-3 Select from the picklist
  • Weekly volumetric flow rate used to calculate CH4 liberated from degasification systems, used in Eq. FF-3
  • Specify units for weekly volumetric flow rate Select from the picklist
  • Length of time that substitute data are used for the weekly volumetric flow rate used to calculate CH4 liberated from degasification systems, used in Eq. FF-3
  • Dates when continuous monitoring equipment is not properly functioning, if applicable (start date and stop date).
    • Insert the first date of the episode in the column labeled "Start date" and insert the last date of the episode in the column labeled "Stop date"; include as many rows as needed for the quarter and week.
    • If CEMS was not used during the week, or if CEMS was functioning properly during the week, do not enter any information in columns A8 and A9.
  • Weekly CH4 liberated at the monitoring point

Click this link to expand