Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Q777.  I have a unit that operates continuously and am not able to complete a calibration of the flow meter without disrupting normal operations. Can I postpone the calibration until the next scheduled maintenance?

 

A777. Changes have been made to 40 CFR 98.394(b) to make the equipment calibration requirements for petroleum products suppliers consistent with other Part 98 calibration requirements.  For units and processes that operate continuously with infrequent outages, it may not be possible to complete the calibration of a flow meter or other measurement device without disrupting normal process operation.  In such cases, the owner or operator may postpone the calibration until the next scheduled maintenance outage. The best available information from company records may be used in the interim.  Such postponements shall be documented in the monitoring plan that is required under §98.3(g)(5).


Show If

 

special@authenticated
Footer / References Bar which is Visible to the public
Wiki Markup
{show-to:group=confluence-Users}{_}Footer / References Bar which is Visible to the public{_}{show-to}
Panel

Updated on

Page info
infoTypeModified date
typeFlatmodified-datemodified-date
dateformatdd/MM/YY HH:mm

Show If
special@authenticated
Info

Source: David Jacobson,

Wiki Markup
{show-to:group=confluence-Users} {info} Source: David Jacobson,

1/22/2014

(Subpart

MM

FAQs_01-15-2014_DJ.docx)

.

Approval

/

Publishing

History:

Version 1

Version 1

Expiration:

none Relevant

None

Relevant Subparts:

Subpart MM {info}{_}History Panel For Internal Use - Not Visible to the Public{_}{show-to}

 Subpart MM


History Panel For Internal Use - Not Visible to the Public

This web site is maintained by a contractor to the U.S. Environmental Protection Agency (RY2021.R.02)