This topic provides a step-by-step description of how to enter subpart D Electricity Generation unit information for this facility.
Click image to expand Cloak |
---|
cloak.toggle.zone | true |
---|
id | PNG1 |
---|
cloak.toggle.type | none |
---|
|
|
Starting on the Subpart D Overview screen, click the link titled "ADD a Unit, Stack, or Pipe or Group" below the SOURCE SUMMARY table.
Click image to expand Cloak |
---|
cloak.toggle.zone | true |
---|
id | PNG2 |
---|
cloak.toggle.type | none |
---|
|
|
Excerpt |
---|
For each unit at your facility, subpart D requires the following information: Wiki Markup |
---|
A unique unit or stack name or identifier (e.g., a unit ID number) as reported under 75.64 \[98.36(d)(1)\(i)\] |
Wiki Markup |
---|
An optional unit or stack description or label \[optional\] |
Wiki Markup |
---|
The Part 75 methodology used to determine the CO{~}2~ mass emissions \[98.36(d)(1)(v)\] |
- CEMS
- Appendix G, Equation G-1
- Appendix G, Equation G-4
- Low Mass Emissions (LME) (§75.19(c)(4)(iii))
Wiki Markup |
---|
The methodology start date and end date \[98.36(d)(1)(vi)-(vii)\] |
Wiki Markup |
---|
An indication of participation in the Acid Rain Program \[98.36(d)(1)(viii)\] |
- Nameplate generating capacity, in MW
- The prime mover technology, from the following list:
- Boiler with Steam Turbine
- Combined Cycle
- Combustion Turbine (Single Cycle)
- Fuel Cell
- Geothermal Steam Turbine
- Hydraulic Turbine
- Internal Combustion Engine
- Microturbine
- Photovoltaic
- Reciprocating Engine
- Steam Turbine
- Stirling Engine
- Wind Turbine
- Other
- The type of thermal energy generation, from the following list::
- Cogeneration Topping Cycle
- Cogeneration Bottoming Cycle
- Bigeneration
- Not Applicable (unit does not generate thermal energy)
- Gross generation, in MWh
- Net generation, in MWh
- For cogeneration or bigeneration, the total gross thermal output, in mmBtu
- Other steam used for the acid rain program EGU, in mmBtu
- Any supplemental firing fuel, if applicable
- Annual mass or volume of supplemental fuel combusted, if applicable
- Additional information
Use the text boxes, drop-down menu and, radio buttons to enter the required information.
|
When finished, click SAVE.
Once you have entered the required unit information for all units at your facility, you will have finished entering the required unit information for your facility.
#Back to Top
Screen Errors
Using e-GGRT to Prepare Your Subpart D Report
Subpart D Unit Emissions Information
Subpart D Fuel Information
Subpart D Fuel Emissions Information
Subpart Validation Report