Subpart Y Delayed Coking Unit Information
Note: The Cal e-GGRT help system includes general instruction on using the California GHG reporting tool. However, the help system may not explain differences between California and U.S. EPA reporting requirements. Please refer to the ARB reporting website for California-specific reporting requirements and additional help.

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migration of unmigrated content due to installation of a new plugin

Anchor
Back to Top
Back to Top

This topic provides a step-by-step description of how to enter Subpart Y Delayed Coking unit information about this facility.

Info

Data reporting for delayed coking is not limited to this section. Data for delayed coking processes must be entered in BOTH the "Facility-Level Emissions Summary" section of Subpart Y and the "Delayed Coking Units" section of Subpart Y.

Composition Setup

Toggle Cloak
idPNG1

Click image to expand

Cloak
cloak.toggle.zonetrue
idPNG1
cloak.toggle.typenone

Panel

Cloak

Adding or Updating Delayed Coking Unit Information

To add or update Subpart Y Delayed Coking Unit Information for this Facility, click the link titled "ADD a Delayed Coking Unit" below the DELAYED COKING UNITS table on the Subpart Y Overview page.

To edit an existing Delayed Coking Unit, click on the edit icon or the Name/ID link in the first column in the DELAYED COKING UNITS table.

To delete an existing Delayed Coking Unit, click on the delete icon in the last column in the DELAYED COKING UNITS table.

Toggle Cloak
idPNG2

Click image to expand

Cloak
cloak.toggle.zonetrue
idPNG2
cloak.toggle.typenone

Panel

Cloak

Subpart Y requires you to report the following data for each delayed coking unit at your facility:

  • A unique name or identifier, plus optional description. See also About Unique Unit Names
  • Method used to calculate the CH4 emissions:
    • 98.253(\i)(1) - Equation Y-18 and Y-19, or
    • 98.253(\i)(2) - Equation Y-18
Info

Note: If you select 98.253(i)(1) - Equation Y-18 and Y-19, you must also add the process vent associated with this delayed coking unit to the process vent section on the Subpart Overview page. The emissions that you enter in the process vent unit page should be zero, because those emissions should be included in the facility-level emissions reported for delayed coking units. Be sure to select "delayed coking" for the "operation type" on the process vent information page. Click this link to access instructions for entering Subpart Y Process Vents Unit Information

When you are finished entering the required information, click SAVE.

Toggle Cloak
idPNG3

Click image to expand

Cloak
cloak.toggle.zonetrue
idPNG3
cloak.toggle.typenone

Panel

Cloak

Adding or Updating Coking Drum Information

To add or update Coking Drum Information for a delayed coking unit, locate the unit in the DELAYED COKING UNITS table on the Subpart Y Overview page, and click OPEN.

Toggle Cloak
idPNG4

Click image to expand

Cloak
cloak.toggle.zonetrue
idPNG4
cloak.toggle.typenone

Panel

Cloak

To add a Coking Drum for a delayed coking unit, click the link labeled "ADD a Coking Drum".

Toggle Cloak
idPNG5

Click image to expand

Cloak
cloak.toggle.zonetrue
idPNG5
cloak.toggle.typenone

Panel

Cloak

Subpart Y requires you to report the following data for each coking drum at your facility:

  • A unique name or identifier, plus optional description. See also About Unique Unit Names
  • Typical drum outage in feet (i.e. unfilled distance from the top of the drum)

When you are finished entering the required information, click SAVE.

Toggle Cloak
idPNG6

Click image to expand

Cloak
cloak.toggle.zonetrue
idPNG6
cloak.toggle.typenone

Panel

Cloak

Repeat this step until you have entered information for all coking drums for this delayed coking unit.

When finished, click SAVE.

#Back to Top

See Also

Screen Errors
Using Cal e-GGRT to Prepare Your Subpart Y Report
Subpart Y Summary Information for this Facility
Subpart Y Delayed Coking Unit Information
Subpart Y Asphalt Blowing Unit Information
Subpart Y Coke Calcining Unit Information
Subpart Y Catalytic Cracking, Fluid Coking, and Catalytic Reforming Unit Information
Subpart Y Flares Unit Information
Subpart Y Process Vents Unit Information
Subpart Y Sulfur Recovery Plant Information
Subpart Y Emissions Information for Process Units Monitored by CEMS
Subpart Validation Report

This web site is maintained by a contractor to the California Air Resources Board (RY2015.R.03)