Enhanced Oil Recovery Injection Pump Blowdown Deferred
Skip to end of metadata
Go to start of metadata
 

Please see Reporting Form Instructions on downloading the blank reporting form and uploading the completed reporting form.

You may also refer to Optional Calculation Spreadsheet Instructions to download the Subpart W calculation spreadsheet.

This page provides an overview of the Subpart W deferred enhanced oil recovery injection pump blowdown source category reporting requirements.

The other emissions from the enhanced oil recovery injection pump blowdown source category are applicable to Onshore Petroleum and Natural Gas Production.

Refer to Enhanced Oil Recovery Injection Pump Blowdown Instructions page for information regarding non-deferred data elements.

EOR Injection Pump Blowdown: Deferred Reporting Requirements

For each EOR Injection Pump, the facility must report:

  • Volume of critical phase gas between isolation valves (cubic feet) (98.236(c)(17)(ii))
  • Number of blowdowns per year (98.236(c)(17)(iii))
  • Critical phase EOR injection gas density (kg/ft3) (98.236(c)(17)(iv))

Click this link to expand

This web site is maintained by a contractor to the U.S. Environmental Protection Agency (RY2018.R.02)